This project consisted of the construction of the infrastructure for a new business park. The project included the widening of Highway 17-A to install new acceleration/deceleration turn lanes, construction of new lane roadway with curb and gutter, and site preparation for the first tenant in the business park. Construction of the total site included clearing of 28 acres and installing erosion control and tree protection measures.
Dirt was moved to construct the subgrade for the roads and building site. The project included storm drainage, gravity sewer, and potable water lines. Roadway and parking lot construction included stone base and asphalt surface, along with curb and gutter, concrete sidewalk, and all pavement marking and traffic signage.