The work included the addition of seven rail lines, a concrete staging platform and incidental related work. Significant sitework was required, including demolition, grading, excavation, cement soil stabilization, and aggregate base course. Several utility lines were relocated which included a high-voltage electrical service. New high-mast lighting was installed with deep foundations (concrete piles). Water and […]
Archives: Projects
Kinder Morgan
Landmark Construction performed all civil work for the terminal expansion which included heavy excavation, earthmoving, foundation installations, secondary containment construction, utility relocations, temporary rail bed construction, road construction, steel erection, and HDPE liner installation.
Santee Cooper Deep Foundations
Landmark constructed the deep foundations for Unit 4 FGD pollution control expansion project at Santee Cooper’s Winyah Electric Generating Station. The scope of work included significant dewatering, excavation, large scale shoring, rebar placement, technical concrete form work, structural steel embeds, mass concrete placement, anchor bolts and imported backfill installation. The project was highlighted by three mass […]
Roper St. Francis
In 2007 Landmark began work on Roper St. Francis’ new hospital built on Highway 17 in Mt. Pleasant. Landmark Construction installed primary electrical service duct bank for the site that included deep excavation, installation of well-point dewatering system, excavation shoring, concrete forming, concrete reinforcing steel installation, concrete placement, and importation, placement, and compaction of select […]