• CONTACT
  • CAREERS
  • Facebook
  • Linkedin
  • Google Plus
  • Instagram
Landmark Construction
Menu
  • Who We Are
    • Our Mission
  • What We Do
    • Concrete Contractors
    • Site Work Contractors
    • Utility Contractors
  • Project Gallery
    • Nexton Parkway
    • A & R Logistics
    • South City Apartments
    • Tremont
    • Palmetto Trade Center
    • Volvo Car Manufacturing Plant
    • Volvo Training Center
    • Floor & Decor
    • Charleston Trade Center
    • CIMC Rail
    • Mercedes-Benz Vans Expansion
    • Philip Simmons High School
    • Nexton Development
    • May River High School
    • Summers Corner Development
    • Tire Kingdom Distribution Center
    • Charleston Naval Weapon Station Rail Yard
    • Pine Hill Business Campus & Arborgen Site
    • Shaw AFB Military Family Housing
    • Santee Cooper Deep Foundations
    • Kinder Morgan Terminal Expansion
  • GPS and 3D Modeling
  • Safety
    • General Safety
    • Safety Through Technology
    • Safety Training
    • Safety Through Process

Pine Hill Business Campus and Arborgen Site

Posted on March 30, 2015January 13, 2022 by Engenius Development

This project consisted of the construction of the infrastructure for a new business park. The project included the widening of Highway 17-A to install new acceleration/deceleration turn lanes, construction of new lane roadway with curb and gutter, and site preparation for the first tenant in the business park. Construction of the total site included clearing of 28 acres and installing erosion control and tree protection measures. Dirt was moved to construct the subgrade for the roads and building site. The project included storm drainage, gravity sewer, and potable water lines. Roadway and parking lot construction included stone base and asphalt surface, along with curb and gutter, concrete sidewalk, and all pavement marking and traffic signage.

Post navigation

South Aviation Boulevard
Privatization of Military Family Housing Shaw Air Force Base

Featured Project

This project included 6 major contracts for sitework, utilities, and road construction. The mass grading contract included moving large amounts of earth and treating it with over 100 million pounds of cement to achieve proper compaction. The 800-acre site was graded for building pads, roads, parking, and site water detention. 7.5 miles of new roads were constructed to access the remote site, along with 14 miles of water and sewer lines.

View Project

  • Carolinas AGC
  • Urban Land Institute
  • South Carolina Economic Developers' Association
  • The Society for Marketing Professional Services
  • American Subcontractors Association
  • Associated Builders & Contractors, Inc
  • ACI Carolina Chapter

Landmark Construction | Copyright © 2022 | All rights reserved. | Managed by Engenius.

  • Who We Are
  • What We Do
  • Projects
  • GPS and 3D Modeling Technology
  • Contact