Road was relocated to allow for construction of a new aircraft apron for the Boeing Plant. The 5,500’ roadway is a four-lane divided road with curb and gutter, stone base, and asphalt pavement. Landmark installed approximately 13,000 LF of silt fence and other erosion control measures. The subgrade was constructed by undercutting of 32,000 CY of […]
Project Category: Manufacuring
Santee Cooper Deep Foundations
Landmark constructed the deep foundations for Unit 4 FGD pollution control expansion project at Santee Cooper’s Winyah Electric Generating Station. The scope of work included significant dewatering, excavation, large scale shoring, rebar placement, technical concrete form work, structural steel embeds, mass concrete placement, anchor bolts and imported backfill installation. The project was highlighted by three mass […]