Landmark Construction performed all civil work for the terminal expansion which included heavy excavation, earthmoving, foundation installations, secondary containment construction, utility relocations, temporary rail bed construction, road construction, steel erection, and HDPE liner installation.
Project Category: Site Work
Santee Cooper Deep Foundations
Landmark constructed the deep foundations for Unit 4 FGD pollution control expansion project at Santee Cooper’s Winyah Electric Generating Station. The scope of work included significant dewatering, excavation, large scale shoring, rebar placement, technical concrete form work, structural steel embeds, mass concrete placement, anchor bolts and imported backfill installation. The project was highlighted by three mass […]
Roper St. Francis
In 2007 Landmark began work on Roper St. Francis’ new hospital built on Highway 17 in Mt. Pleasant. Landmark Construction installed primary electrical service duct bank for the site that included deep excavation, installation of well-point dewatering system, excavation shoring, concrete forming, concrete reinforcing steel installation, concrete placement, and importation, placement, and compaction of select […]
Santee Cooper Shallow Foundations
Landmark constructed the shallow foundations for the Santee Cooper Winyah Electric Generating Station Unit 4 FGD project. The scope of work included dewatering, excavation, rebar placement, technical vertical concrete formwork, precision anchor bolt placement and mass concrete placement. The project consisted of large mat foundations, cast-in-place trenches, duct banks, electrical manholes, large equipment foundations, containment […]