Landmark is undertaking a significant concrete job at a local power generating facility, focusing on upgrading the wastewater system. This project involves the meticulous placement of 13,600 cubic yards of concrete and the installation of 1,050 tons of rebar to ensure structural integrity.

Our team is also installing 3,000 linear feet of trench drain to manage runoff effectively and prevent flooding. The project includes the construction of five large tank pads and the installation of two sump pumps to enhance the facility's operational efficiency. Additionally, we are building three large pile caps as part of the wastewater system upgrade.