Nexton Parkway

Site Work | Utilities

This project involved the construction of a 2,500 linear foot, four-lane divided arterial road, connecting Nexton to SC Highway 176. Enhancements at the highway intersection included the addition of turn lanes and a new traffic signal. Our work encompassed the installation of erosion control measures, comprehensive grading, storm drainage systems, curb and gutter, and asphalt paving for the entire roadway.

Previous
Previous

Nautilus Waldrich Colburg

Next
Next

Phillip Simmons